The third (and the last) technical action of the project has just begun. It is named “Pilot test in railway constructions” and it aims to carry out several pilot tests in real railway constructions. The tool will be tested in these constructions, as a demonstration, to perform a parametric adjustment and to verify compliance with the environmental requirements, minimizing the future impacts of these constructions.